2005-07 CAPITAL IMPROVEMENT PLAN
The Capital Improvement Budget Request for 2005-2007 is detailed on Schedule A and asks approval and funding for the following projects:
SPECIAL REPAIR AND REHABILITATION
No request for Special Repair and Rehabilitation
NEW CONSTRUCTION
Request for School of Business/General Classroom Building and Related Physical Plant Expansion for 2005-2007
Request for Recreation and Fitness Center Expansion - Phase II for 2005-2007
No requests for Acquisitions for 2005-2007
No requests for Major Equipment for 2005-2007
The 2005-2007 Capital Improvement Budget Request asks for funding and approval of several general repair and rehabilitation projects totaling $1,939,038. The repair and rehabilitation projects planned for completion in the 2005-2007 biennium include the following:
Renovate Wright Administration Building Forum Wing Lecture Halls I and III
Repair walkways throughout campus
Replace east one-half of roof on Murphy Auditorium
Perform exterior repairs to the Neef House in New Harmony·
Replace exterior light fixtures with metal halide type - Phase II
Repair Robert D. Orr Center wall covering in corridors, stairs, and classrooms
Renovate Robert D. Orr Center restrooms to provide wheelchair accessibility
Upgrade fire alarm systems in Science Center, Wright Administration, Technology Center, and Physical Activities Center buildings
Replace exposed lighting lamps and install on-off controls for lights in utility tunnels
Replace roof on Wright Administration Building
Replace roof on Technology Center
Repair high temperature water system valves and insulation in utility tunnels
Repair chilled water system valves and insulation in utility tunnels
Replace 12,470-volt electric distribution cable and switchgear in utility tunnels
Repair University Boulevard, Clarke Lane, and Bent Twig Lane asphalt pavement
Repair front entrance to Theatre Costume Building
Renovate Theatre Building exterior and correct water leakage in basement
Rebuild Weber Cabin in New Harmony
The General Repair and Rehabilitation and Infrastructure funding requested, along with funds from other sources, will keep deferred maintenance to a minimum and the University and New Harmony structures, facilities, and campus in a satisfactory condition.
The 2005-2007 Capital Improvement Budget Request includes the following schedules:
Schedules A through F - Capital Improvement Budget Request
Attachment B - Debt Service Schedules for Fee-Replaced Bond Issues
Income II - Preliminary Fee Replacement Requests
Background II-A and Background II-B - Principal Retirement Schedules
Academics | Calendar | Athletics | Visitors | Events and News | Administration
8600 University Boulevard - Evansville, IN 47712-3596 - 812/464-8600
Copyright © 2008 University of Southern Indiana. All rights reserved.